13/12/2007

FCC Construcción awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia

FCC Construcción awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia

The total length is 34,755 m using helical welded steel pipes with outer diameters of 1,720 and 1,320 mm. It includes three power recovery stations of 1, 1.6 and 2.6 MW.

general

Available languages:

Ca
En
Es