FCC finishes up work on the Castellón Harbour breakwater
READ MORECastellón Harbour is immersed in the construction of an innovative breakwater situated at the incoming channel, near the southern basin. The breakwater, which is being built by FCC in a joint venture, consists of 13 reinforced-concrete caissons, ten of which lie along the main alignment, for a total length of 448.40 me...