The work of FCC Construcción on line 8 of the Madrid Metro is labelled a success due to the time taken and method used
LEER MÁSThe work of FCC Construcción on line 8 of the Madrid Metro is labelled a success due to the time taken and method used
The work took place on the 7-km stretch, of which 5 are double-tracks and 2 are single tracks, between the stations of Mar de Cristal and Campo de las Naciones.
The most significant activity undertaken b...