Search filter

Latest News

26/07/2017

FCC Construcción wins the tender for the construction of a pedestrian path between the beaches of Fuentebravía and Las Redes (Cádiz).

READ MORE

The path will enable journeys to be made on foot or by bicycle along the coastal front of the municipality of El Puerto de Santa María. Running parallel to the Santa Catalina beach, it will be built on the existing masonry wall. The length of the path will be just over 1.117 km between both ends. The trail starts at Pu...

  • general
21/06/2017

FCC Construcción’s Bolaños tunnel works shortlisted for the NCE Techfest Awards 2017

READ MORE

The announcement was made on 19 June on the website of the awards’ organising committee. The winners will be announced in London on 14 September.

The Works consist of building two parallel tunnels each carrying a single track for the Madrid–Galicia high speed rail line, each 6.7 kilometres long.

FCC Construcción has alre...

  • general
08/06/2017

The Minister for Development visits the Mediterranean High Speed Corridor Connection Project

READ MORE

With a budget of €110 million, the project consists of installing the track superstructure for the entire section of the railway corridor connecting the Mediterranean Corridor with the Madrid – Barcelona – French frontier high speed line and all the infrastructure actions necessary for its proper implementation.

Feature...

  • general
26/05/2017

FCC shows the progress of the Wanda Metropolitano in Engineering Week

LEER MÁS

Currently, FCC Construcción is instlling the radial rings of the membrane covering the Wanda Metropolitano grandstands. The roof consists of 720 PTFE (polytetrafluoroethylene) panels providing the 83,000 square metres of roof, a unique and differentiating element compared to the rest of the European sports installation...

  • general
26/05/2017

FCC finishes building the highest indoor rock climbing centre in Spain

LEER MÁS

The project was part of the framework reformations agreement for Madrid City Council buildings undertaken by FCC Construcción and running from October 2014 to July 2017.

As well as building the rock climbing centre itself, the project involved remodelling the changing rooms and accesses to the pavilion, building a movea...

  • general