Search filter

Latest News

09/05/2010

400.000 Visitors a Day Fill the Austrian Pavilion at the Shanghai Expo

READ MORE

The Austrian World's Fair office awarded the contract for the construction of the Austrian pavilion to Alpine, FCC's Austrian subsidiary, in 2009. Work began in July of last year and construction ended on schedule in March 2010. The pavilion cost 5.5 million euro to build.

The exhibit space, an area of more than 2,100 s...

  • general
04/05/2010

The Telefónica ZeroZero building wins the Quatrium Prize for the Best Architectonic Project

READ MORE

Torre Telefónica Diagonal ZeroZero, designed by Enric Massip-Bosch, developed by the Free Zone Consortium to house Telefónica's corporate offices in Barcelona and built by FCC, won the 2010 Quatrium Prize for the Best Architectonic Project. The Quatrium Prize is given by the Vía Group, a publishing and communications c...

  • general
02/05/2010

The Ministry of Development awards FCC a section of the “AVE” High-Speed Train line in Castellón for 83 million euros

READ MORE

The Ministry of Development, through the Railway Infrastructure Administrator -Adif-, is awarding FCC -in Joint Venture- the Almazora-Castellón section of the Valencia-Castellón route on the future Madrid-Castile-La Mancha-Autonomous Community of Valencia-Region of Murcia High-Speed Line. The contract awarded is for a ...

  • general
02/05/2010

FCC achieves the award of a railway line in Algeria totaling nearly 1 billion euros

READ MORE

FCC is the successful bidder, in a Joint Venture with the private Algerian group ETRHB HADDAD, for the design and construction of a railway line 185 km in length, running to the west of the capital, Algiers, connecting the towns of Relizane, Tiaret and Tissemsilt. This new line has a budget of 935.5 million euros and a...

  • general
27/04/2010

FCC takes part in the II Bridge Conference Meetings held in San Sebastian

READ MORE

At these meetings organized by the Spanish Highway Association last April, FCC gave several presentations on the state of the art in viaduct construction using the incremental launching method employing prefabricated segments developed by José Ignacio González Esteban, the Structures Service Director, which met with g...

  • general