Search filter

Latest News

26/01/2017

Nuevo director general de FCC Construcción

LEER MÁS

Con dependencia directa del consejero delegado de FCC, Carlos M. Jarque, Pablo Colio asumirá la gestión de toda la operación de FCC Construcción a nivel nacional, internacional y de FCC Industrial.

Pablo Colio (1968), arquitecto por la Escuela Técnica Superior de Madrid y con varios cursos de dirección en el Instituto ...

  • general
16/01/2017

FCC Construcción obtains “I calculate and reduce” stamp of the Register of Carbon Footprint, Offsetting and Carbon Dioxide Absorption Projects

LEER MÁS

Companies that voluntarily undertake this initiative receive a stamp from the Government for participating in the register, which acknowledges their effort in the fight against climate change. The registration certificates for each period can be downloaded on the company's intranet.

As a new feature, in 2015, we obtaine...

  • general
27/12/2016

FCC Construcción inaugurates the Andalusian Contemporary Creation Centre (C3A) (Córdoba)

LEER MÁS

The unique building, designed by architects Enrique Sobejano and Fuensanta Nieto, is situated in the Campo de la Verdad- Miraflores neighbourhood, on the south bank of the Guadalquivir river, in Córdoba. This features 12,207 m2 distributed over 4 floors, including the basement and rooftop. The hexagonal building accomm...

  • general
27/12/2016

FCC Construcción wins the Raos dock 9 (Santander) expansion contract

LEER MÁS

The facilities consist of a 280 meter long dyke attached to the Raos east side central breakwater. This expansion will be carried out by anchoring eleven concrete blocks and batter and backfilling. The pier will be aligned with the current Terquisa berthing; 707,000 cubic meters will be dredged and filled with 266,000 ...

  • general
12/12/2016

Load testing takes place on the Almonte viaduct built for ADIF by FCC

LEER MÁS

The purpose of the load testing is to check that the viaduct structure’s response to service loads is in accordance with the design project, thus guaranteeing the structure’s reliable performance in its future functionality.

On high-speed railway viaducts, even before the railway superstructure (slag, rails, catenary .....

  • general