Search filter

Latest News

12/08/2008

FCC Construcción has been awarded the contract for the construction of the first phase of the Balearic Islands docks and the multi-functional Terminal of the Port of Tarragona for 71.8 million euros.

READ MORE

FCC has been contracted by TPS, the Tarragona Port Services, to carry out the first phase of Balearic Islands docks and the multi-functional Terminal of the Port of Tarragona for an amount of 71.8 million euros.

The works to be carried out over 30 months involve the construction of a 750 metre-long dock, using 26 reinfo...

  • general
12/08/2008

The development of the Montmar area in Barcelona will be carried out by FCC Construcción for 20.2 million euros.

READ MORE

FCC Construcción will re-develop the Montmar area, located in the Castelldefels municipal area for the Barcelona City Council for a total amount of 20.2 million euros over a period of 14 months and a half.

The preliminary work involves the dismantling of the sewers, street lighting and street furniture. The existing roa...

  • general
11/08/2008

The Minister for Development attends the breakthrough of the La Cabrera (Valencia) tunnel

READ MORE

The Minister for Development, Magdalena Álvarez, attended the breakthrough or end of the boring of the second of the tubes in the La Cabrera runnel on 25 September. The tunnel is located in the Siete Aguas-Buñol section of the future Madrid-Castile La Mancha-Valencian Region- Murcia Region high speed railway line and w...

  • general
11/08/2008

FCC wins the contract for the high-speed railway tunnel in Madrid for €206 million.

READ MORE

The Ministry for Development has awarded the building of the high speed rail track and tunnel connecting the stations of Atocha and Chamartín to FCC in a temporary joint venture with other companies. The budget is €206 million with an undertaking schedule of 32 months.

This section of new route has double international ...

  • general
11/08/2008

The enlargement of line 2 of the Metro will be carried out by FCC with a schedule of 27 months and an investment of €157 million.

READ MORE

The Madrid regional government has awarded the lengthening of line 2 of the Metro from La Elipa to Las Rosas to FCC Construcción in a temporary joint venture with Acciona with a schedule of 27 months and a budget of €157 million.

This will be a new underground section 4 .5 km long with four new Metro stations to benefit...

  • general