Search filter

Latest News

13/11/2018

The Amancae team, led by FCC Construccion, presented the preliminary design of the new Jorge Chávez International Airport in Lima

READ MORE

The Amancae team and Lima Airport Partners (LAP) presented the preliminary design of the new air terminal at Jorge Chávez International Airport. The team formed by the Amancae consortium between FCC Construccion and Salini Impregilo, and with the participation of Aecom as the main design leader, was selected last Septe...

  • general
08/11/2018

FCC firma el contrato de concesión de la prisión de Haren (Bruselas)

READ MORE

El área de construcción del Grupo FCC ha firmado el contrato para el diseño, construcción, financiación, operación, mantenimiento y concesión, por 25 años, de un nuevo complejo penitenciario en el municipio de Haren, región de Bruselas.

  • general
07/11/2018

FCC reports net profits of €176M in the first nine months of the year

READ MORE

The FCC Group has recorded net attributable profit of €176M in the first nine months of the year, which represents an increase of 14.7% against the €153.5M obtained in the same period of 2017, due to the good performance of operating activities in all business areas.

  • general
06/11/2018

FCC Construccion completes the construction project of the Eurostars hotel in Torre Sevilla

READ MORE

The construction area of the FCC Group has completed the construction project of the Eurostars hotel in Torre Sevilla. FCC Construccion executed the construction of Torre Sevilla, 180 meters high, to subsequently be awarded the adaptation and adaptation of plants 19 to 37 for hotel use, with a five-star category.

  • general
05/11/2018

FCC Construccion obtains the best score in the tender "Line 2 Connection Branch to Tocumen International Airport"

READ MORE

FCC Construccion, through the Línea 2 Ramal Consortium, formed by Odebrecht and FCC, has obtained the best score in the tender for the "Line 2 Connection Branch to the Tocumen International Airport".

  • general