Search filter

Latest News

14/01/2008

Alpine signs contract to install the railway infrastructure in the St Gotthard base tunnel

READ MORE

The Transtec Gotthard consortium, to which Alpine belongs, will carry out the railway installation work in the St Gotthard base tunnel in Switzerland.

The Transtec Gotthard consortium consists of Alpine Bau GmbH, Atel Installationstechnik AG, Alcatel-Lucent Schweiz AG, Thales Rail Signalling Solutions AG and Balfour Bea...

  • general
14/01/2008

FCC Construcción starts to bore the second tube of the Buñol - Siete Aguas section of the La Cabrera tunnel (Valencia)

READ MORE

FCC Construcción has started to bore the second tube one of the most important and complex works on the future Madrid - Castile La Mancha - Valencian region - Murcia region high speed line for Adif. This is the second longest tunnel tube on the 914 km line, located in the Sierra de la Cabrera on the section between Sie...

  • general
14/01/2008

FCC Construcción achieves a new record with the tunnel boring machine in Prat de Llobregat.

READ MORE

During a 24 hour shift on 28 March, FCC Construcción excavated 60 m of tunnel in the project to build line 9 of the Metro in El Prat de Llobregat, Barcelona, a record for this section being built by FCC in a temporary joint venture with other companies, using a 9.4 m diameter earth pressure balance (EPB) tunnel boring ...

  • general
14/01/2008

The Greek Minister of Public Works and the Environment visits the Athens metro works

READ MORE

Giorgios Souflias, the Minister of Public Works and the Environment, visited the work being carried out by FCC Construcción in Athens for Attiko Metro on 9 May. The Minister was accompanied by the Chairman of the, George Yannis, and by the General Director, Theodoros Kontogiannopoulos, who could examine the quality of ...

  • general
14/01/2008

Rosa Ramahlo Cobetar awarded the Catraia Dos Poços - Venda de Galizes section of the IC6

READ MORE

Estradas de Portugal EPE has awarded Ramalho Rosa Cobetar, a subsidiary of FCC Construcción in Portugal, the Catraia Dos Poços - Venda de Galizes section of the IC6 for €59.4 million. This is an expressway 17.2 km long with a 4.5 km branch to Tábua. Its building will involve 2.3 million m3 of excavation, 2.8 of embankm...

  • general