Search filter

Latest News

26/03/2008

The Entorno-BCSD Foundation, which includes FCC, presents its 2008 action plan

READ MORE

The Entorno-BCSD España Foundation, with which FCC is associated, has presented its initiatives to address the challenges of sustainable development in 2008.

The working plan of the Entorno-BCSD España Foundation and its member companies for 2008 includes 3 work groups: "Climate Change and Energy", "The Role of Business...

  • general
09/03/2008

Convensa to recondition a subsection of the Mediterranean HST corridor

READ MORE

The Ministry of Development has awarded Convensa, a subsidiary of FCC Construcción, the contract to double the track and recondition a 6,475-metre-long subsection of the Murcía-Almería section of the Alcantarilla-Lorca railway line, to make it suitable for speeds of 210 kilometres per hour. The subsection runs through ...

  • general
28/02/2008

FCC Construcción participates in the publication entitled Construcción Sostenible (Sustainable Construction) which is promoted by the Entorno Foundation.

READ MORE

Fundación Entorno-BCSD España has presented its publication entitled "Construimos Valor. Incentivos a la Construcción Sostenible", -We build Value. Incentives for Sustainable Construction-, the first result of the Sustainable Construction Working Group of which FCC Construcción is a member, along with another 9 compani...

  • general
27/02/2008

FCC adjudicated €9.89 million project in the Port of Valencia

READ MORE

FCC has been adjudicated a contract worth €9.82 to enlarge the Levante dock in the Port of Valencia, in a temporary joint venture.The contract includes building an extension to the Levante dock to reach the Desguace, with a depth of 16 met6res, and enlarging the area by 32,000 square metres.

  • general
20/02/2008

Alpine to build new lock in the port of Vienna

READ MORE

ALPINE has been awarded a new contract, worth €15 million, to build a new lock and pumping station in the port of Freudenau, between the outer harbour and the port itself. Work has started already and the lock will be in use by the end of 2010. Normal activity will continue in the port during the work. The installation...

  • general