Search filter

Latest News

15/04/2015

Walkways in Lusail, Qatar, at 75% completion

READ MORE

This project is under development in the central area of the complex and includes the construction of two singular pedestrian bridges which connect three of the four man-made islands which are planned throughout the project.

The two twin structures with identical features (cable-stayed platform of three spans of 30 + 60...

  • general
14/04/2015

FCC takes part in the international conference for Infraportos South America, held in Brazil

READ MORE

It is an international conference that joins professionals from the port infrastructure sector, in which FCC participated by setting up a stand and giving a talk on the Port of Acu. The talk was presented by Antonio Piqueras, Acu project manager, and Francisco Esteban Lefler, Director of Innovation and Technology at FC...

  • general
13/04/2015

Construction work has begun on the L4 viaducts of the FCC-constructed Riyadh metro

READ MORE

The ceremony to mark the commencement of works was chaired by H.R.H. Prince Faisal bin Bandar bin Abdulaziz; accompanied by the Riyadh Mayor and Chairman of the Oversight Committee of the ambitious metro project, H.E. Ibrahim al Sultan; authorities and by Jaime Freyre de Andrade, Director of the FAST consortium. The co...

  • general
30/03/2015

Avance del Puente Gerald Desmond

LEER MÁS

Los trabajos en el vano de aproximación han avanzado considerablemente en los últimos meses y las cimentaciones están avanzadas en un 40 % aproximadamente , registrando el grado de avance general de la obra en un 24 %.

El GDB es el primer puente atirantado que se ejecuta en California.

El proyecto consiste en la sustituc...

  • general
23/03/2015

The last caisson of the seawall works at the Port of Acu in Brazil is anchored

READ MORE

The last caisson of the main seawall alignment, number 38, was anchored on Saturday 14 March. There are only 3 caissons left to be anchored, corresponding to one of the 3 inner berths (to this date 44 caissons out of a total of 47 have been anchored).

The main challenge was to anchor 38 of the seawall's caissons under s...

  • general