Search filter

Latest News

07/11/2010

FCC to build Torre Cajasol for 21 million euro

READ MORE

The contract covers the second phase of the building's construction, which includes the shallow foundations, floor structure and metal crown roof.

Designed by architect César Pelli and located in Seville, the skyscraper will tower to a height of 180 metres and have four basements. It is the tallest building ever planned...

  • general
03/11/2010

Further acknowledgement for the refurbishment of Zaragoza University’s Assembly Hall

READ MORE

FCC's refurbishment of the building housing the Zaragoza University Assembly Hall has won further acknowledgement in the form of an honourable mention from the judges of the Thirty-first Ricardo Magdalena Architecture Award. The refurbishment was designed by architects Luis Franco and Mariano Pemán.

The building, which ...

  • general
02/11/2010

Opening of the FCC-built section of the CV-10 between Pobla Tornesa and Cabanes

READ MORE

President Francisco Camps of Valencia, accompanied by President Carlos Fabra of the Castellón Council and other senior authorities, cut the ribbon on the new section of the CV-10 on the 21st last.

This section of road, which was built by FCC, is eight kilometres long. It runs between the towns of Pobla Tornesa and Caban...

  • general
02/11/2010

New FCC-built dock opened at Rota Naval Base

READ MORE

The ceremony held on the 19th last was conducted by the Admiral-in-Chief for Support at Cádiz Bay, Vice Admiral José Ángel Pita Rodrigo. During the ceremony the occupation certificate was signed by Zone I Manager José María Torroja on behalf of FCC Construcción, Ricardo Sanz Saiz as architectural supervisor and the Adm...

  • general
28/10/2010

FCC wins the contract for a new section of high-speed railway

READ MORE

The Spanish Ministry of Development has picked a joint venture featuring FCC to build the Mediterranean Corridor connection for the high-speed Madrid/Barcelona/French Border line. The contract award is worth a total of 129 million euro.

The section is 61.9 kilometres long and has double tracks rated to enable trains to ...

  • general