Search filter

Latest News

26/03/2008

Te funciona FCC wins contract to clean up the Flix reservoir

READ MORE

The state-owned company Aguas de las Cuencas Mediterráneas, Acuamed, which depends on the Ministry of Environment, has awarded the contract to decontaminate the Flix reservoir in Tarragona to FCC Construcción in a joint venture with FCC Ámbito. This reservoir in the Flix district on the river Ebro currently contains a ...

  • general
26/03/2008

The Entorno-BCSD Foundation, which includes FCC, presents its 2008 action plan

READ MORE

The Entorno-BCSD España Foundation, with which FCC is associated, has presented its initiatives to address the challenges of sustainable development in 2008.

The working plan of the Entorno-BCSD España Foundation and its member companies for 2008 includes 3 work groups: "Climate Change and Energy", "The Role of Business...

  • general
09/03/2008

Convensa to recondition a subsection of the Mediterranean HST corridor

READ MORE

The Ministry of Development has awarded Convensa, a subsidiary of FCC Construcción, the contract to double the track and recondition a 6,475-metre-long subsection of the Murcía-Almería section of the Alcantarilla-Lorca railway line, to make it suitable for speeds of 210 kilometres per hour. The subsection runs through ...

  • general
28/02/2008

FCC Construcción participates in the publication entitled Construcción Sostenible (Sustainable Construction) which is promoted by the Entorno Foundation.

READ MORE

Fundación Entorno-BCSD España has presented its publication entitled "Construimos Valor. Incentivos a la Construcción Sostenible", -We build Value. Incentives for Sustainable Construction-, the first result of the Sustainable Construction Working Group of which FCC Construcción is a member, along with another 9 compani...

  • general
27/02/2008

FCC adjudicated €9.89 million project in the Port of Valencia

READ MORE

FCC has been adjudicated a contract worth €9.82 to enlarge the Levante dock in the Port of Valencia, in a temporary joint venture.The contract includes building an extension to the Levante dock to reach the Desguace, with a depth of 16 met6res, and enlarging the area by 32,000 square metres.

  • general