The FAST consortium, led by FCC, starts dynamic testing of Riyadh Metro
READ MOREThe FAST consortium, led by FCC, has successfully completed the first test on lines 4, 5 and 6 of the Riyadh Metro Project, owned by Arriyadh Development Authority (ADA). The tests include the demonstration of the performance of the railway system, from the power supply to the signaling systems, making use of the train...