Search filter

Latest News

25/05/2008

FCC Construcción to install the track between Siete Aguas-Valencia and Valencia -Almussafes

READ MORE

ADIF has awarded FCC Construcción the installation of 43 km of double track in the Siete Aguas-Valencia section, 17.4 km of double track in Almussafes-Valencia and a goods branch with three rails -two gauges-, 19.1 km long, for €39.2 million and a timetable of 17 months. The project includes an installation base in Alm...

  • general
25/05/2008

FCC Construcción adjudicated the improvement of the southern dock in the Port of Castellon

READ MORE

The Castellon Port Authority has awarded FCC Construcción in a joint venture with another company the work on the eastern dock, dredging and improvement of the port's southern dock for €18.78 million. The work will take a year.

  • general
25/05/2008

FCC Construcción to build phase I of the port development on the right bank of the Avilés estuary

READ MORE

The port authority has awarded FCC Construcción phase I of the port development on the right bank of the Avilés estuary in a joint venture with a local company, for €24.71 million. The work includes a wharf 506 m long with a draught of 14 m. The superstructure is supported on piles 1.65 m in diameter arranged in four r...

  • general
20/05/2008

FCC Construcción achieves a new record with the tunnel boring machine in Prat de Llobregat.

READ MORE

El día 28 de marzo, en las obras de construcción de la línea 9 de Metro en el Prat de Llobregat, Barcelona, y en un turno de 24 h, FCC Construcción, en UTE con otras empresas, realizó la excavación de 60 m de túnel, mediante una tuneladora EPB (Earth Pressure Balance), de 9,4 m de diámetro, cifra récord para esta secci...

  • general
20/05/2008

FCC Construcción awarded Maçanet–Fornells de la Selva section of the AP-7

READ MORE

ACESA, a subsidiary of Abertis, has awarded to FCC Construcción the contract for the third lane on the AP-7 motorway between Maçanet and Fornells de la Selva -Gerona-, corresponding to the carriageway-extension Project between La Jonquera, Vila-Seca and Salou. The section is 18.7 Km long. The works, with a budget of 45...

  • general