FCC Construccion awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia
READ MOREAguas de la Cuenca del Segura has awarded FCC Construcción a section of the trunk branch between the Altiplano junction and the connection with the Campotejar waste water treatment plan for €42.3 million.
The total length is 34,755 m using helical welded steel pipes with outer diameters of 1,720 and 1,320 mm. It ...