Search filter

Latest News

07/11/2018

FCC reports net profits of €176M in the first nine months of the year

READ MORE

The FCC Group has recorded net attributable profit of €176M in the first nine months of the year, which represents an increase of 14.7% against the €153.5M obtained in the same period of 2017, due to the good performance of operating activities in all business areas.

  • general
06/11/2018

FCC Construccion completes the construction project of the Eurostars hotel in Torre Sevilla

READ MORE

The construction area of the FCC Group has completed the construction project of the Eurostars hotel in Torre Sevilla. FCC Construccion executed the construction of Torre Sevilla, 180 meters high, to subsequently be awarded the adaptation and adaptation of plants 19 to 37 for hotel use, with a five-star category.

  • general
05/11/2018

FCC Construccion obtains the best score in the tender "Line 2 Connection Branch to Tocumen International Airport"

READ MORE

FCC Construccion, through the Línea 2 Ramal Consortium, formed by Odebrecht and FCC, has obtained the best score in the tender for the "Line 2 Connection Branch to the Tocumen International Airport".

  • general
31/10/2018

FCC secures contract to design and construct the new "North Runway" at Dublin Airport

READ MORE

FCC Construccion (FCC) has won the contract for the design and construction of the new “North Runway” at Dublin Airport (Ireland).

  • general
24/10/2018

The accesses from the M-40, built by FCC, to the Wanda Metropolitano, are open to traffic

READ MORE

The accesses from the M-40, built by FCC, to the Wanda Metropolitano, have been opened to traffic. The new exit 9A built by FCC Construccion, allows direct access to Av Luis Aragones, from the M-40.

  • general