FCC Filtro Noticias
Search filter

FCC takes home the contract for the road between La Aldea and El Risco, Gran Canaria

10/03/2009

FCC takes home the contract for the road between La Aldea and El Risco, Gran Canaria

FCC takes home the contract for the road between La Aldea and El Risco, Gran Canaria

This job is part of the design for the future GC road that will connect Agaete with San Nicolás de Tolentino, and it is included in the Cooperation Agreement on Matters of Roads between the Canary Island Government and the Ministry of Development.

The section from La Aldea to El Risco will be 10 kilometres long. That is 35.48% shorter than the current road. In addition, the extremely rugged route will be smoothed out.
The design calls for seven viaducts, a twin-tube 2,339-metre-long tunnel, two single-tube, two-way, three-lane tunnels (one 518 metres long and the other 604 metres long) and an 87-metre-long cut-and-cover tunnel. The section will also have two junctions, one at El Andén Verde and the other at Güi-Güi, and one intersection at La Aldea.

Available languages:

ca_ES en_US es_ES