Search filter

Latest News

21/06/2017

FCC Construcción’s Bolaños tunnel works shortlisted for the NCE Techfest Awards 2017

READ MORE

The announcement was made on 19 June on the website of the awards’ organising committee. The winners will be announced in London on 14 September.

The Works consist of building two parallel tunnels each carrying a single track for the Madrid–Galicia high speed rail line, each 6.7 kilometres long.

FCC Construcción has alre...

  • general
08/06/2017

The Minister for Development visits the Mediterranean High Speed Corridor Connection Project

READ MORE

With a budget of €110 million, the project consists of installing the track superstructure for the entire section of the railway corridor connecting the Mediterranean Corridor with the Madrid – Barcelona – French frontier high speed line and all the infrastructure actions necessary for its proper implementation.

Feature...

  • general
26/05/2017

FCC shows the progress of the Wanda Metropolitano in Engineering Week

LEER MÁS

Currently, FCC Construcción is instlling the radial rings of the membrane covering the Wanda Metropolitano grandstands. The roof consists of 720 PTFE (polytetrafluoroethylene) panels providing the 83,000 square metres of roof, a unique and differentiating element compared to the rest of the European sports installation...

  • general
26/05/2017

FCC finishes building the highest indoor rock climbing centre in Spain

LEER MÁS

The project was part of the framework reformations agreement for Madrid City Council buildings undertaken by FCC Construcción and running from October 2014 to July 2017.

As well as building the rock climbing centre itself, the project involved remodelling the changing rooms and accesses to the pavilion, building a movea...

  • general
22/05/2017

The work of FCC Construcción on line 8 of the Madrid Metro is labelled a success due to the time taken and method used

LEER MÁS

The work of FCC Construcción on line 8 of the Madrid Metro is labelled a success due to the time taken and method used

The work took place on the 7-km stretch, of which 5 are double-tracks and 2 are single tracks, between the stations of Mar de Cristal and Campo de las Naciones.

The most significant activity undertaken b...

  • general