Search filter

Latest News

08/09/2017

FCC Construcción recognised by the Vigo Mining and Energy Engineering School

LEER MÁS

Gerardo González Álvarez, head of international studies, received the diploma on behalf of FCC Construcción.

The main objective of this project is the research and development of new technologies in the area of the prevention of occupational risks in the construction sector. It also assists with equipping current preven...

  • general
07/09/2017

The Cañas-Liberia road in Costa Rica awarded for technological innovation by Cemex

LEER MÁS

The Cemex Projects Prize is an award recognising the best construction practices in the world and their creators in five categories (residential housing, economic housing, building, group space and infrastructure) and with four special awards (universal accessibility, sustainable building, social value and innovation i...

  • general
18/08/2017

FCC receives a visit by the Deputy Governor of Riyadh to the Metro stations

LEER MÁS

The first phase of the station was terminated in June with the completion of the upper slab, allowing vehicles to travel over it. Currently, work is focused on building the station accesses, architecture and electrical and mechanical installations. All the stations will have air conditioning and leading edge safety and...

  • general
01/08/2017

FCC Construcción completes the installation of the Wanda Metropolitano roof membrane

LEER MÁS

The roof consists of 720 PTFE (polytetrafluoroethylene) panels covering the 83,000 square metres of the roof area.

The radial membrane was installed at a height of 40 m from the ground in an operation that required unrolling, tightening and installing the panels to the two traction rings. The steel structure weighs 6,33...

  • general
26/07/2017

FCC Construcción wins the tender for the construction of a pedestrian path between the beaches of Fuentebravía and Las Redes (Cádiz).

READ MORE

The path will enable journeys to be made on foot or by bicycle along the coastal front of the municipality of El Puerto de Santa María. Running parallel to the Santa Catalina beach, it will be built on the existing masonry wall. The length of the path will be just over 1.117 km between both ends. The trail starts at Pu...

  • general