The FCC Construcción team continues to remove the cantilever bridge cranes from the arch
READ MOREThe operation consisted of lowering the main beams of the cantilever bridge cranes that were used to execute the North edge of the Almonte arch.
The lowering operation was carried out using a system of 4 HEAVY LIFTING type hydraulic cylinders with a synchronised stroke between the 4.
The weight of the part to be lowered ...