FCC Filtro Noticias
Search filter

FCC Construccion awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia

01/10/2007

FCC Construccion awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia

Aguas de la Cuenca del  Segura has awarded FCC Construcción a  section of the trunk branch between the Altiplano junction and the connection  with the Campotejar waste water treatment plan for €42.3 million.


The total length is 34,755   m using helical welded steel pipes with outer diameters  of 1,720 and 1,320 mm.  It includes three power recovery stations of 1, 1.6 and 2.6 MW.

Available languages:

ca_ES en_US es_ES